Abuwarda, Z and Hegazy, T (2016) Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142(11).

Bayram, S and Al-Jibouri, S (2016) Efficacy of Estimation Methods in Forecasting Building Projects’ Costs. Journal of Construction Engineering and Management, 142(11).

Brockmann, C, Brezinski, H and Erbe, A (2016) Innovation in Construction Megaprojects. Journal of Construction Engineering and Management, 142(11).

Carretero-Ayuso, M J, García-Sanz-Calcedo, J and Reyes-Rodríguez, A M (2016) Qualitative and Quantitative Analyses on Project Deficiencies in Flat-Roof Design in Extremadura, Spain. Journal of Construction Engineering and Management, 142(11).

Chancellor, W and Lu, W (2016) A Regional and Provincial Productivity Analysis of the Chinese Construction Industry: 1995 to 2012. Journal of Construction Engineering and Management, 142(11).

Gardner, B J, Gransberg, D D and Jeong, H D (2016) Reducing Data-Collection Efforts for Conceptual Cost Estimating at a Highway Agency. Journal of Construction Engineering and Management, 142(11).

Gosling, J, Pero, M, Schoenwitz, M, Towill, D and Cigolini, R (2016) Defining and Categorizing Modules in Building Projects: An International Perspective. Journal of Construction Engineering and Management, 142(11).

Lee, J (2016) Estimating Cumulative Damages due to Disruptions in Repetitive Construction. Journal of Construction Engineering and Management, 142(11).

  • Type: Journal Article
  • Keywords: Disruption; Productivity loss; Ripple effect; Damages; Earned value management (EVM); Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001184
  • Abstract:
    Disruption to continuous workflow is a major cause of cost overruns affecting many construction projects, especially for repetitive construction. The compensatory claims for damages including disruption are different from damages due to delay because of the complex characteristics of disruption per se. To estimate the cumulative damages due to disruptions, all the possible issues of damages caused by interruption of workflow should be considered. Various methods have been proposed in the literature for analyzing the impact on schedules and the damages resulting from disruptions. However, these methods have a limitation because they do not consider the ripple effect of disruptions. This paper proposes a modified method that can reasonably estimate damages caused by disruptions in construction projects, especially for repetitive construction. The proposed method includes the resource continuity and earned value analysis research methodologies to forecast the direct effect of disruptions. In addition, earned value management (EVM) is utilized to demonstrate and forecast the ripple effect of disruptions on construction activities. The original contribution of the paper is summarized as (1) application of EVM to the topic of damage calculations due to changed process sequence and (2) development of a method to assess the ripple effect as well as the direct effect of disruptions on project productivity performance.

Lee, Y, Kim, J and Lee, T S (2016) Topological Competiveness Based on Social Relationships in the Korean Construction-Management Industry. Journal of Construction Engineering and Management, 142(11).

Liang, C, Lu, W, Rowlinson, S and Zhang, X (2016) Development of a Multifunctional BIM Maturity Model. Journal of Construction Engineering and Management, 142(11).

Love, P E D and Smith, J (2016) Toward Error Management in Construction: Moving beyond a Zero Vision. Journal of Construction Engineering and Management, 142(11).

Lv, X and El-Gohary, N M (2016) Discovering Context-Specific Integration Practices for Integrating NEPA into Statewide and Metropolitan Project Planning Processes. Journal of Construction Engineering and Management, 142(11).

O’Connor, J T, Choi, J O and Winkler, M (2016) Critical Success Factors for Commissioning and Start-Up of Capital Projects. Journal of Construction Engineering and Management, 142(11).

Rodríguez-Garzón, I, Martínez-Fiestas, M, Delgado-Padial, A and Lucas-Ruiz, V (2016) An Exploratory Analysis of Perceived Risk among Construction Workers in Three Spanish-Speaking Countries. Journal of Construction Engineering and Management, 142(11).

Seo, J, Lee, S and Seo, J (2016) Simulation-Based Assessment of Workers’ Muscle Fatigue and Its Impact on Construction Operations. Journal of Construction Engineering and Management, 142(11).

Zhou, H W, Zhou, Y H and Zhao, C J (2016) Fault-Response Mechanism of Production System in Concrete-Dam-Construction Simulation. Journal of Construction Engineering and Management, 142(11).